FredZepp Posted September 20, 2017 Posted September 20, 2017 They have been speaking of an area, in the old building at 225 Parsons, to observe some of the manufacturing part of Heritage. When I spoke to Jim Deurloo about moving the equipment back, it seems like maybe some part of the process stays in that large part of the secondary buildings built in the 60s. With 3 floors in the 1917 part of Parsons Street, there is a lot of room to set up a more public area to watch Heritage manufacturing in a renovated historic building. There's a lot of area that isn't detailed in those drawings yet.
bolero Posted September 20, 2017 Posted September 20, 2017 that is an interesting observation...surely they will continue building instruments on-site? I thought they were moving production back into the original building, once reno is done. It has 4 floors? maybe only 1 floor will be retail
skydog52 Posted September 20, 2017 Author Posted September 20, 2017 The Plan was to move production back to the original 3 story building we know and love. With these new revelations who knows? My hope is they stay with the original plan. Fingers crossed
FredZepp Posted September 28, 2017 Posted September 28, 2017 Oh yeah... great video. Well done and cool to watch.
schundog Posted September 29, 2017 Posted September 29, 2017 That Rocked. Great video, great things to come from Heritage, I'm sure.
Steiner Posted September 29, 2017 Posted September 29, 2017 Do they know when the stack goes back up it should read "GIBBON"?
Yooper Posted September 29, 2017 Posted September 29, 2017 3 hours ago, Steiner said: Do they know when the stack goes back up it should read "GIBBON"? Yes, exactly like it has been for a century.
Recommended Posts
Archived
This topic is now archived and is closed to further replies.